Component sourcing and BOM management, approved before purchase

Procurement against your approved bill of materials: availability and lifecycle checks, authorized-channel sourcing, and controlled substitutions that you approve in writing before anything is bought. Sourcing runs alongside fabrication so parts and boards arrive together.

At a glance
You provideBOM with manufacturer part numbers, quantities and reference designators; any approved-vendor list or no-substitute lines
We coordinateBOM review, availability and lifecycle checks, substitution proposals, authorized-channel procurement, kitting to the build
Hands off toPCB assembly — sourcing continues through repeat orders

Quoted after a file and capability review. Facility and manufacturing origin are confirmed with you in writing before work begins.

What’s included

What the service covers

BOM review

Part numbers, quantities, and reference designators are checked for gaps, duplicates, and mismatches against the CPL before sourcing starts.

Availability and lifecycle checks

Stock position and lifecycle status (active, NRND, end-of-life) are reviewed for every line, with risks flagged early.

Controlled substitutions

Alternates are proposed with reasons — form, fit, function — and approved by you in writing. Approved alternates are recorded against the BOM.

Authorized-channel procurement

Components are sourced through authorized distribution; broker sourcing is used only with your explicit approval and documented.

Approved-vendor requirements honored

AVL constraints and no-substitute lines are carried into the build documentation and respected across repeat orders.

Long-lead planning

Long-lead items are identified at review so ordering can start ahead of the board schedule where you approve it.

What you provide

Inputs for an accurate quote

BOM with manufacturer part numbers, quantities and reference designators; any approved-vendor list or no-substitute lines. Most projects arrive with some of this; the file review lists exactly what is missing and nothing is ordered until the package supports it.

Preparing an RFQ →  ·  BOM checklist →

FAQ

Questions about component sourcing

Will you substitute parts without asking?

No. Substitutions are proposed with reasons and approved by you in writing before purchase. The approved alternate is recorded against the BOM so the next build uses the same decision.

Can you source only the hard-to-find parts?

Yes. Partial-turnkey arrangements are common: you consign what you hold, and the remaining lines are sourced against your BOM. The split is documented per build.

How do you handle end-of-life components?

Lifecycle status is checked at BOM review. End-of-life or not-recommended parts are flagged with options — last-time buy, qualified alternate, or a design change — for your decision before the build is planned.

The production path
Previous stage02 — PCB AssemblyNext stage04 — NPI and Pilot Builds

All seven services · Where is your project now?

Send what you have. We’ll tell you what’s needed.

Complete manufacturing packages and early prototypes are reviewed the same way — by one accountable partner who stays with the project from prototype to repeat production.