Service 07 · 07

Repeat production: rebuilds to the controlled revision, every time

Revision-controlled rebuilds of a released design. The same documentation, approved substitutions, and project owner carry forward, so a repeat order starts from a known state instead of a fresh explanation.

At a glance
You provideQuantities and schedule; revision changes when they happen; forecast if you have one
We coordinateOrder planning against the controlled revision, sourcing refresh, build, test, delivery, status reporting
Hands off toThe next order — continuity for the life of the product

Quoted after a file and capability review. Facility and manufacturing origin are confirmed with you in writing before work begins.

What’s included

What the service covers

Builds to the controlled revision

Every order references a specific released revision; nothing is changed without a re-release.

Sourcing refresh

Availability and lifecycle are re-checked before each run; any needed change is proposed for approval, not slipped in.

Engineering change handling

Changes are documented, approved, and released as new revisions with an effectivity you decide.

Schedule and status visibility

Build status, risks, and issues reported through completion and delivery.

Consistent test and inspection

The same procedures and acceptance criteria applied run after run, with results documented.

Forecast-based planning

Where you share a forecast, long-lead items and capacity are planned ahead with your approval.

What you provide

Inputs for an accurate quote

Quantities and schedule; revision changes when they happen; forecast if you have one. Most projects arrive with some of this; the file review lists exactly what is missing and nothing is ordered until the package supports it.

Preparing an RFQ →  ·  BOM checklist →

FAQ

Questions about repeat production

We already have a documented product built elsewhere. Can you take it over?

Yes. The review checks your existing documentation — fabrication data, BOM with approved alternates, assembly drawings, test procedures — and lists what is missing before a first build on the new facility is planned as an NPI-style run.

How are engineering changes handled mid-stream?

Changes are documented, approved by you, and released as a new revision with an agreed effectivity. Work in progress is completed to the current revision unless you direct otherwise.

Can you hold inventory or build to a forecast?

Stocking and forecast-based purchasing can be arranged per project and are documented, including how liability for purchased material is handled.

The production path
Previous stage06 — Box-Build Assembly
Next stageThe next order

All seven services · Where is your project now?

Send what you have. We’ll tell you what’s needed.

Complete manufacturing packages and early prototypes are reviewed the same way — by one accountable partner who stays with the project from prototype to repeat production.

Request a quoteTalk to a specialist first